The VORTEXPROM team has completed the installation of a blending line for the company GidroRemService in Ufa
At the customer's site in Ufa, work was carried out on the installation and commissioning of a line for blending lubricating oils based on the VORTEXPROM CMD5 installation and a pre-mixing tank with a volume of 1.3 m3.
A turnkey laboratory for 7 basic analyses was also supplied for production.
The capacity of the installation is 5 m3/hour. The production capacity of the line is 120,000 liters/month when the company operates in 1 shift for 8 hours and 20 working shifts per month. The line allows to produce up to 6 types of lubricating oils in one working shift. It is equipped with automatic sequential dosing of up to 4 components and a safety group (overflow protection and emergency shutdown), an automatic mixing time control mechanism. The installation of the line took 6 calendar days.